If you do not know how to pass the exam more effectively, I'll give you a suggestion is to choose a good training site. This can play a multiplier effect. IT-Tests.com site has always been committed to provide candidates with a real IBM 000-109 certification exam training materials. The IT-Tests.com IBM 000-109 Certification Exam software are authorized products by vendors, it is wide coverage, and can save you a lot of time and effort.
IT-Tests.com is a professional IT certification sites, the certification success rate is 100%. This number is proved by candidates through practice. Because IT-Tests.com has a strong IT team of experts, they are committed to study exam questions and answers, and serve the vital interests of the majority of candidates. They use their own professional mind and experience to meet the needs of the candidates. According to the needs of the candidate, they consider the issue from all angles, and manufacturing applicability exam training materials. This material is IBM 000-109 exam training materials, which including questions and answers.
IT-Tests's expert team has developed a latest short-term effective training scheme for IBM certification 000-109 exam, which is a 20 hours of training for the candidates of IBM certification 000-109 exam. After training they can not only quickly master a lot of knowledge, but also consolidate their original knowledge. So they can easily pass IBM certification 000-109 exam and it is much more cost-effective for them than those who spend a lot of time and energy to prepare for the examination.
Are you IT person? Do you want to succeed? If you want to succeed, please do to buy IT-Tests's IBM 000-109 exam training materials. Our training materials have through the test of practice. it can help you to pass the IT exam. With the IT-Tests.com's IBM 000-109 exam training materials, you will have better development in the IT industry. You can enjoy the treatment of high-level white-collar, and you can carve out a new territory in the internation. Are you still worried about your exam? IT-Tests.com's IBM 000-109 exam training materials will satisfy your desire. We are through thick and thin with you and to accept this challenge together .
Exam Code: 000-109
Exam Name: IBM (Virtualization Technical Support for AIX and Linux - v2 )
Free One year updates to match real exam scenarios, 100% pass and refund Warranty.
Total Q&A: 180 Questions and Answers
Last Update: 2013-12-20
000-109 (Virtualization Technical Support for AIX and Linux - v2 ) Free Demo Download: http://www.it-tests.com/000-109.html
NO.1 An administrator has the following configuration on a VIO Server:
Why is this error being displayed?
A. ent3 is configured as 'standard' instead of '802.3ad'
B. ent3 is a LHEA port and requires the -L flag
C. ent3 has no interface connected
D. ent3 is controlled by the SEA
Answer: D
IBM 000-109 original questions 000-109 questions 000-109
NO.2 Requirements for a disaster recovery site are being collected. When considering restoring a VIO Server
mksysb to disaster recovery hardware,
what is required to ensure automatic virtual device recreation?
A. LPAR profiles must be accurately recreated on the foreign machine
B. Backups of both mksysb and user-defined structures are required from the VIO Server
C. The foreign machine must be of the same model and type
D. Configuration of the existing HMC needs to be preserved
Answer: A
IBM exam prep 000-109 000-109 000-109
NO.3 What tool can an architect use to determine which is the smallest POWER7 server that will provide
equal or better overall performance than a POWER5 570?
A. Facts and Features Guide
B. LPAR Validation Tool
C. Configurator for eBusiness
D. Server Magic
Answer: A
IBM 000-109 000-109 000-109 000-109 exam
NO.4 How can an existing AIX 5.2 LPAR, which is using SAN storage, be migrated into a versioned WPAR
(Workload Partition)?
A. Using LPM, but downtime will be required.
B. Dynamically using LAM.
C. Backup and restore a mksysb.
D. Rezone the SAN storage and use NPIV.
Answer: C
IBM 000-109 pdf 000-109 pdf 000-109
NO.5 An administrator is creating several LPARs on a new Power Systems server. The administrator knows
that Live Partition Mobility (LPM) will be used to distribute the workload between this new machine and
several others in the environment.
In addition to ensuring all storage is allocated through Virtual IO servers, what else must the administrator
take into consideration when creating the new LPARs?
A. LPAR names in the environment must be unique.
B. Redundant error path reporting must be configured.
C. Only LPARs belonging to the same workload group can be moved between servers.
D. The Virtual IO server code level must be the same across all servers.
Answer: A
IBM 000-109 demo 000-109 study guide 000-109 000-109
NO.6 An architect is looking at the implications of uncapped weights for a new POWER7 system. The
system will consist of four uncapped logical partitions with the following weightings:
Assuming all partitions have equal entitlement and virtual processor configurations in the partition profiles,
and request additional resources from the shared processor pool over a period of 1000 cycles, how many
cycles will be allocated to LPAR B?
A. 150
B. 250
C. 300
D. 1000
Answer: C
IBM demo 000-109 dumps 000-109 000-109
NO.7 An LPAR is configured using Virtual IO. It has two Virtual SCSI adapters, connecting it to two VIO
servers.
The disks presented over Virtual SCSI are available across both Virtual SCSI adapters (2 paths).
Assuming 20 disks are required, what is the maximum recommended queue depth to maximize
performance?
A. 20
B. 22
C. 510
D. 512
Answer: A
IBM 000-109 000-109
NO.8 An administrator is designing a new system for their existing batch environment. The current system is
a POWER5 570 with 16 cores and 128GB of RAM with a single LPAR running AIX 5.3. It takes 12 hours
to run their large batch job which is heavily CPU bound on 4 the available CPUs.
The new system will be a Power 770 with 16 cores, 128GB of RAM and the LPAR will run AIX 6.1.What
should be done to maximize the batch performance?
A. Activate TurboCore mode during batch processing
B. Disable Simultaneous Multi-threading
C. Disable Multiple Shared Processor Pools
D. Set the processor compatibility mode to POWER7
Answer: B
IBM practice test 000-109 000-109 exam prep
NO.9 An administrator has a requirement to back up a VIO server (VIOS) so that it can be rebuilt in the event
of a disaster.
Which set of actions will achieve this requirement.?
A. Backup all non rootvg volume groups using savevg. Backup all Storage Pool Information. Run a
mksysb of the system.
B. Save "Upgrade Data" on the HMC. Backup all non rootvg volume groups using savevg. Run a mksysb
of the VIOS with the -U flag.
C. Backup non rootvg structures using savevgstruct. Capture virtual mappings to a file using viosbr. Run a
backupios
D. Capture the virtual network tuning to a file using the optimizenet command. Capture all virtual device
attributes to a file using the lsattr command. Run a backupios.
Answer: C
IBM 000-109 test answers 000-109 000-109
NO.10 A Power 720 is being used to build 2 environments: Test and Production, with 2 LPARs in each
environment. Processor resources must be separated between the Test and Production environments to
reduce possible contention, while still being able to share processor resources inside each own
environment.
What are the two features required, as a minimum, to accomplish this? (Select 2)
A. IVM
B. HMC
C. PowerVM Express
D. PowerVM Standard
E. IVE
F. IBM Systems Director
Answer: B,D
IBM test answers 000-109 000-109 000-109
NO.11 Which of the following is required to support AME?
A. AIX LPARs
B. Virtual I/O Server
C. A maximum of 4GB of RAM per LPAR
D. On-demand memory feature enabled
Answer: A
IBM 000-109 000-109 000-109 000-109 braindump
NO.12 What will cause a broadcast storm when configuring redundant VIO servers with SEA failover?
A. The secondary SEA is brought online before the configured primary SEA.
B. A mismatch of defined VLANs between the primary and secondary SEA.
C. The secondary SEA is created before enabling failover on the primary SEA.
D. Incorrect EtherChannel configuration on one SEA
Answer: C
IBM dumps 000-109 000-109 test
NO.13 The wlmstat -@ 2 command has been run from a global environment with the following results:
What action can an administrator take to set limits, so that both server1 and server2 use the same amount
of CPU resources?
A. Use the cpu_deallocate -P command to reduce the CPU resources on server2
B. Use the chsysres command to assign the same CPU attributes to both servers.
C. Use the chwpar -R command to set the CPU attributes for each server.
D. Use the syncwpar -E command to copy the CPU resource allocation from server1 to server2.
Answer: C
IBM exam simulations 000-109 practice test 000-109 000-109 000-109
NO.14 An administrator is performing a Live Partition Mobility (LPM) operation between two servers managed
by different HMCs.
While monitoring the performance of the partition, the virtual console window suddenly closes. What is the
most likely cause?
A. The virtual console is controlled by the HMC and closes when the second takes control of the partition.
B. The virtual console is a connection to the FSP of the physical server and closes when the LPAR
migrates.
C. The SSH keys have not been exchanged between HMCs.
D. The FSP has the MAC address for the first HMC cached in NVRAM.
Answer: B
IBM 000-109 000-109 practice test 000-109 exam
NO.15 When attempting to install a VIO client using NIM, an adminstrator finds that no disks are available for
installation. The disks are provided by NPIV through the virtual Fibre Channel adapter as described here:
Which of the following explains why is the administrator unable to see the disks?
A. The virtual fibre channel device has not been assigned to the client.
B. The HBA on the VIO server is not connected to the SAN.
C. The fibre device drivers are missing from the SPOT.
D. The LUNs have been incorrectly zoned.
Answer: D
IBM 000-109 000-109 000-109 000-109 000-109
NO.16 Which interface must be used to provide virtualization of tape library devices to client LPARs?
A. USB
B. LTO
C. Virtual SCSI
D. Virtual Fibre Channel
Answer: D
IBM 000-109 000-109 exam simulations
NO.17 An administrator must remove any installed efixes before attempting to install a new VIO Fix Pack.
Which VIO command will advise if any VIO efixes are actually present?
A. lslpp
B. emgr
C. lssw
D. oem_platform_level
Answer: C
IBM 000-109 questions 000-109
NO.18 An administrator is attempting to configure a new deployment of 56 POWER7 Blades across 4 IBM
BladeCenter H chassis. Each blade will be installed with an IVM and 2 LPARs.IVM is installed and the
administrator checks that both LHEA ports are reporting a Link State of "Up." 2 LPARs are created and the
network traffic balanced by allocating one LHEA port to the first LPAR, the second port to the other. After
successfully installing the first LPAR via NIM, the administrator finds the second LPAR fails to netboot.
What should the administrator verify on the BladeCenter Chassis?
A. That 4 power supplies (PSU) have been installed.
B. That both the external LHEA ports have been cabled.
C. That a secondary I/O module has been installed and cabled.
D. That the Multi-Core Scaling (MCS) attribute is correctly set on both LHEA ports.
Answer: C
IBM pdf 000-109 exam dumps 000-109 000-109 certification training 000-109 exam
NO.19 A Linux LPAR is configured using 802.1Q.
The virtual Ethernet device is configured as an 802.1Q compatible adapter and has VLAN ID 5 configured
in the 802.1Q additional VLAN field.
The administrator runs the following commands on the Linux LPAR shell without errors:
vconfig add eth0 5ifconfig eth0 10.0.0.2 netmask 255.255.255.0
When the administrator tries to ping 10.0.0.1, the request times out.
What is the problem?
A. The VLAN ID should be in the VLAN-ID field in the virtual Network device configuration.
B. The administrator is using the incorrect Ethernet device.
C. The 8021q module is not loaded.
D. The 802.1Q interfaces are not supported on Linux on Power Systems servers.
Answer: A
IBM 000-109 test 000-109 answers real questions 000-109
NO.20 An administrator is preparing to upgrade the environment's dual Virtual I/O servers (VIOS) from V1.2
to V2.1
What must considered in preparation for this upgrade?
A. All client LPARs must be shutdown as both VIO servers have to be upgraded to V2.1 at the same time.
B. The VIOS must be upgraded to the latest fixpack of V1.5 before upgrading to V2.1.
C. The only upgrade method that will be supported is using NIM because the current VIOS is lower than
V1.3.
D. VIOS V2.1 requires AIX clients to be running AIX V6.1 at a minimum.
Answer: B
IBM 000-109 000-109 000-109
IT-Tests.com offer the latest 98-372 Questions & Answers and high-quality C_TSCM62_65 PDF Practice Test. Our MB6-889 VCE testing engine and 3103 study guide can help you pass the real exam. High-quality E20-018 Real Exam Questions can 100% guarantee you pass the exam faster and easier. Pass the exam to obtain certification is so simple.
Article Link: http://www.it-tests.com/000-109.html
没有评论:
发表评论